The Control Lead is designed for strong erratic pullers, absorbing the pull pressure along the surface of the soft bungee webbing which extends and retracts according to your dog's behaviour, minimizing the risk of injury to you or your dog.
Features
• Shock absorbing webbing
• ShocLoc control system
• Reflective stitching
• SnapLoc trigger hook
• Waste bag holder
• Durable nylon
• Soft neoprene handle
Sizes guide
(control lead length) width of webbing size
• M - (1.4m) 16mm
• XL - (0.8m) 25mm
(HLLOC25A)
SKU | HLLOC25A |
Barcode # | 649510037702 |
Brand | Rogz |
Shipping Weight | 0.5000kg |
Shipping Width | 0.100m |
Shipping Height | 0.001m |
Shipping Length | 0.100m |
Be The First To Review This Product!
Help other Squizzy's Online users shop smarter by writing reviews for products you have purchased.